精品久久免费观看_亚洲国产成人爱AV在线播放_国产又粗又爽又猛的视频_国产v亚洲v天堂a7m

Pressure test reservation

新聞資訊

新聞資訊

Tonzo ppr quickly install the elevator base is listed in March

2017-03-30
Product pictures
 

At the time of installation, a elevator base is installed at 1 m per interval.

As shown in the figure below:

Each hanger can be up to 600N.

It's about 4.8 N per meter in full water,

600N>>>>>>4.8N。



Ensure the quality of the products is stable while ensuring the speed of installation.